STAR group provided the electrical and high voltage services of this project, this includes services for the installation of a chamber substation.
Star Group’s services provided on the project included:
- 1 x Single chamber substation
- Surveying of Trench Routes
- Trenching and Conduiting
- Exploratory Civil Works
- Temporary Restorations
- Low Voltage Interconnectors
- High and Low Voltage Cable Jointing
- Chamber metal works and louvers
- Lighting and Power Sytems
- Transformer Installations
- Low Voltage Switchboard installation; and
- Testing and commissioning.