Star Group has provided the signalling, testing and commissioning works of this project, which includes services for the following ARTC Sections: Goobang junction to Narromine, Narromine to Dubbo, Dubbo to Merrygoen, Merrygoen to Gulgong and Merrygoen to Gap.
Star Group’s services provided on the project included:
- Installation, testing and commissioning works as required by the supplied verified signalling design of the train Order working signalling equipment for the below sections:
- 1) Goobang junction (448.500 km) to Narromine (497.500 km)
- 2) Narromine (497.500 km) to Dubbo (462.000 km)
- 3) Dubbo (462.000 km) to Merrygoen (417.785 km)
- 4) Merrygoen (417.785 km) to Gulgong (459.500 km)