Star Group provided the electrical services of the project, which incorporates services that equips the Wastewater Treatment plant with appropriate process capability, reliability and operability to ensure its compliance with current EPA licence requirements to 2031, and ensure the continued protection of beach water quality.
Star Group’s services provided on the project included:
- 152m of 300mm wide NEMA 2 aluminium cable ladder, covers, and fittings
- Electrical, instrumentation and controls cables
- Sub-mains cables
- Earthing and Equipotential bonding conductors
- Plug-and-socket assemblies
- Testing of all cables and control system signals
- Cables and cable supports
- LED light fittings
- Fixed single-phase 15Amp
- Fixed three-phase 32Amp
- IP65 switched socket power outlets
- Flow and pressure switches
- Field handstations
- Flexible or rigid conduits or strut
- Stainless steel IP65 junction boxes
- Cable markers and cable core markers
- Temporary power
- 8mm nylon pneumatic tubing; and
- Air consuming equipment.