You are here:
The Nepean Hospital Redevelopment Project involved the construction of a new clinical building that occupies an area of 55,000m2 at the original hospital site in Kingswood. This new facility will comp ...
Crown Sydney Hotel Resort is Sydney’s first 6 Star luxury hotel resort, situated in the South of Banrangaroo on Sydney Harbour.
The overall re-development encompasses new Clinical Services Building and associated works, Construction of the Hospital Street ‘Spine’ connection from new Clinical Services Building to ex ...
161 Sussex Street, Hyatt Regency Hotel Redevelopment included refurbishment of the existing hotel, the construction of a new 3,667 sqm convention centre and a 26 level tower which consists of 13 new h ...
The 5MRD Dee Why Chamber development features sublime towers that comprises of 123 apartments that range from studios, 1 bedroom, 1 bedroom plus study, 2 bedroom and 2 bedroom plus study apartments ov ...
The Central Park Block 11 Development project consists of a 13 storey, curvaceous apartment building block that houses a large variety of one bedroom suites, 2 and 3 bedroom apartments and a number of ...
The ARC by CROWN GROUP development project is located within the Sydney CBD at 161 Clarence Street and 304 Kent Street, Sydney.
The Manly Vale Public School Redevelopment project is set to accommodate up to 1000 primary school students and consisted of the construction of 40 new home bases, a library, a hall, a canteen, storag ...
The West Hotel Development Project is a boutique hotel, designed by Fitzpatrick + Partners that boasts an eight-level tower with a distinctive geometric façade and is located at 65 Sussex Stre ...
The Chatswood Metro Apartment Development project consisted of the construction of 553 apartments in 3 high rise residential towers, all of which vary in height and orientation, namely, the Grand, Spi ...
The ICC Sofitel Sydney Development included the construction of a new 39 storey tower which include 600 hotel rooms, restaurant, 3 bars, a gymnasium, outdoor landscaped pool and executive club lounge.
The Pacific Bondi Beach development is a landmark 26,000m2 Gross Floor Area and 7,241m2 Retail Floor Space mixed-use development located immediately behind the iconic Bondi Surf Club and beach.
The Thirty8 Albert Avenue Development project consists of the construction of two nine-storey towers and three podium levels.
The Ausgrid Learning Centre project involved the construction of a multiple-storey training facility, basement car parking, service area, and external landscape and training yard.
The Reserve Bank of Australia is a 22 storey high rise tower that occupies a full block of land on Martin Place and holds historical significance for its ability to portray a post war cultural shift w ...
The Auburn Hospital Redevelopment project involved the construction of a new six storey state of the art hospital facility which comprises of two main wings with approximately 25,000m2 of floor space. ...
Search, browse or refine Star Group projects