You are here:
This project covers both the Dungog Waste Water Treatment Works (WWTW) Stage 1 and Kurri Kurri WWTW Stage 3 upgrade. The Dungog WWTW Project is a new WWTW built adjacent to the existing Dungog WWTW. T ...
The Australian Defence Force Academy (ADFA) Redevelopment project provides a learning space that effectively prepares and expose budding Officers of the ADF (Army, Navy and Air Force) to the expectat ...
The UNSW Science & Engineering Building is a new building which spans 10 levels and provides 24,500 square metres of state-of-the art teaching and research space.
The UNSW Material Science and Engineering Building Development project spans 9 levels and is approximately 23,500m2 of additional research and teaching space.
The Manly Vale Public School Redevelopment project is set to accommodate up to 1000 primary school students and consisted of the construction of 40 new home bases, a library, a hall, a canteen, storag ...
Oxford Falls Grammar School is a Kindergarten to Year 12, Christian, co-educational school situated in Oxford Falls, on the Northern Beaches of Sydney.
The UTS Broadway Campus Redevelopment project compromised the demolition of the existing building and the construction of a new state-of-the-art glass encased podium and 17-storey tower.
The Boggabri Open Cut Coalmine is situated in the North-west region of NSW. The expansion project has allowed for an increase in the annual production of coal to 6.9Mtpa from 1.5Mtpa.
The Tyree Energy Technologies Building is the new home of energy research at the University of New South Wales and has an area of 16,000m2.
The Gungahlin College project incorporates a range of environmentally sustainable design features aimed at achieving a 5 Green Star rating from the Green Building Council of Australia whilst also stri ...
The CSA (Cobar) Mine is located approximately 14 kilometres northwest from the township of Cobar in central western NSW and produces more than 1 million tonnes of ore and 180,000 tonnes of copper conc ...
Mardi Dam is an off-river storage dam located near the Wyong River. The redevelopment of this site allowed for a more effective water transfer from Mardi Dam to Mardi water treatment plant and increas ...
The Australian National University Student Accommodation Development comprised the development of a 188 room facility, constructed from stackable modular units.
The UOW Molecular Life Science Building development project covers an approximate spread of 6,300m2 over 4 occupied levels and a rooftop plantroom.
The University of Wollongong Stage 1 Development project involves the construction of a part 6 and part 7 story building which accommodates 215 units, totalling 261 beds in a range of unit sizes and c ...
The Wollongong University Stage 2 development project involves the demolition of 14 existing buildings to make way for 3 new 7-8 storey buildings that accommodate 802 beds in a range of room sizes and ...
The Ausgrid Learning Centre project involved the construction of a multiple-storey training facility, basement car parking, service area, and external landscape and training yard.
The Malabar Wastewater Treatment plant treats 635,000 properties across 500 square kilometers and is the largest primary waste water treatment plant in Australia.
Search, browse or refine Star Group projects