You are here:
The Wagga Wagga Base Hospital Phase 2 Health Services Re-development project involved the design and construction of the new 8 storey, Acute Hospital building which houses 230 overnight beds, 6 operat ...
The Byron Shire Central Hospital Development project consists of a new one and two storey purpose-built, public hospital with 65 beds. It will include an Emergency Department, acute medical beds as we ...
STAR Group was engaged by the Department of Parliamentary Services (DPS) to undertake the RCD Upgrade Project – Stage 4 (Suites) on Parliament House.
The Federation Chamber at the Australian Parliament House is the venue in which debates of a restricted range of business occurs.
The Australian War Memorial development project incorporates a range of landscape and architectural elements within a nationally significant heritage landscape.
The Lismore Base Hospital Redevelopment project has provided improved access to and equity in the delivery of a wider range of services and additional capacity which addresses the rapid increase in th ...
The CSIRO, Black Mountain Campus Redevelopment project consisted of the expansion of the current campus to address the current standards for health and safety and the inefficient use of space, high ma ...
The Northwest Rapid Transit Redevelopment Project comprised of the extension of approximately 23 kilometres of new track and rail systems to deliver Sydney's new generation of metro trains and 4,000 c ...
The Manly Vale Public School Redevelopment project is set to accommodate up to 1000 primary school students and consisted of the construction of 40 new home bases, a library, a hall, a canteen, storag ...
The M4 East Motorway Redevelopment project entails the extension of the M4 Motorway via the new twin motorway tunnels between Homebush and Haberfield via Concord.
Bradfield Tunnel is located at the intersection of Bradfield Highway and Cahill Expressway, Circular Quay below the Shangri-La Hotel.
The Australian Taxation Office is a 7,150sqm commercial office block on the northern portion of the former Gosford Public School site. The office building designed by award-winning architects BVN an ...
Heathcote Road is a major arterial road that runs between Liverpool and Heathcote, connecting Sydney’s southern suburbs to the motorway network in the south-west, this includes the M5 and M7 mot ...
The Ausgrid Learning Centre project involved the construction of a multiple-storey training facility, basement car parking, service area, and external landscape and training yard.
The City West Cable Tunnel Development project consists of the construction of a 1.62 kilometer long and 3.5 metre wide, 132kV cable tunnel that carries transmission cabling across the city’s ce ...
The City East Cable Tunnel (CECT) Development project comprised of the construction of a 3.2 kilometer long and 3.5 meter wide, 132KV cable tunnel that is segmentally lined.
The Reserve Bank of Australia is a 22 storey high rise tower that occupies a full block of land on Martin Place and holds historical significance for its ability to portray a post war cultural shift w ...
The Auburn Hospital Redevelopment project involved the construction of a new six storey state of the art hospital facility which comprises of two main wings with approximately 25,000m2 of floor space. ...
Search, browse or refine Star Group projects