You are here:
Crown Sydney Hotel Resort is Sydney’s first 6 Star luxury hotel resort, situated in the South of Banrangaroo on Sydney Harbour.
161 Sussex Street, Hyatt Regency Hotel Redevelopment included refurbishment of the existing hotel, the construction of a new 3,667 sqm convention centre and a 26 level tower which consists of 13 new h ...
The UNSW Science & Engineering Building is a new building which spans 10 levels and provides 24,500 square metres of state-of-the art teaching and research space.
The UNSW Material Science and Engineering Building Development project spans 9 levels and is approximately 23,500m2 of additional research and teaching space.
The 5MRD Dee Why Chamber development features sublime towers that comprises of 123 apartments that range from studios, 1 bedroom, 1 bedroom plus study, 2 bedroom and 2 bedroom plus study apartments ov ...
The Central Park Block 11 Development project consists of a 13 storey, curvaceous apartment building block that houses a large variety of one bedroom suites, 2 and 3 bedroom apartments and a number of ...
The ARC by CROWN GROUP development project is located within the Sydney CBD at 161 Clarence Street and 304 Kent Street, Sydney.
The Manly Vale Public School Redevelopment project is set to accommodate up to 1000 primary school students and consisted of the construction of 40 new home bases, a library, a hall, a canteen, storag ...
Oxford Falls Grammar School is a Kindergarten to Year 12, Christian, co-educational school situated in Oxford Falls, on the Northern Beaches of Sydney.
The West Hotel Development Project is a boutique hotel, designed by Fitzpatrick + Partners that boasts an eight-level tower with a distinctive geometric façade and is located at 65 Sussex Stre ...
The 18 Honeysuckle Drive Development project provides a modern commercial tower positioned within the Newcastle cultural and civic precinct and located at the prominent CBD harbourfront.
The ICC Sofitel Sydney Development included the construction of a new 39 storey tower which include 600 hotel rooms, restaurant, 3 bars, a gymnasium, outdoor landscaped pool and executive club lounge.
The Thirty8 Albert Avenue Development project consists of the construction of two nine-storey towers and three podium levels.
The Ausgrid Learning Centre project involved the construction of a multiple-storey training facility, basement car parking, service area, and external landscape and training yard.
The City West Cable Tunnel Development project consists of the construction of a 1.62 kilometer long and 3.5 metre wide, 132kV cable tunnel that carries transmission cabling across the city’s ce ...
The UNSW Bio Science Early Works Development project comprised of works required to make the site and its surrounds ready for the demolition, construction and refurbishment involved in the main projec ...
The Hunter Sports High Redevelopment Project involved the refurbishment and replacement of the existing buildings on site which have reached the end of their economic life, with new state of the art e ...
Search, browse or refine Star Group projects